The Town of Vienna is in the process of constructing a new police department facility, located at 215 Center Street S. This project has been in assessment and planning stages for almost a decade. As design of the facility is finalized, the Town is preparing in summer 2020 to seek bids from pre-qualified construction contractors.

The resulting facility will allow the Vienna Police Department to serve the community in a more efficient and secure manner. The facility will provide needed additional space for current staffing and technological needs. It also will provide the Town with additional community space for gatherings, meetings, and classes.

History
The Vienna Police Department has been located at 215 Center Street S since 1994 when the current building was erected. The current facility has 9,800 square feet and 24 parking spaces.  In 2007, due to expanding operations and increased technology requirements, the criminal investigations section was relocated to Town Hall. Currently, the Police Department occupies 1,800 square feet in Town Hall. 

IFB 21-03 Vienna Police Department Construction

IFB 21-03

List of Pre-Qualified Bidders


Full Set of Drawings

2019.06.03 Vienna PS - Geotech - R1


2020.08.28_VPS Specifications Volume 1

2020.08.28_VPS Specifications Volume 2

B100_Underslab Drainage Diagram

B500_Underslab Drainage Details

Existing - Civil

Existing - Electrical

Existing - Structural

Existing - Architectural

Existing - Mechanical & Plumbing

IFB 21-03 Addendum 1

IFB 21-03 Addendum 2  

IFB 21-03 Addendum 3

IFB 21-03 Bid Tab

Police Facility Space Needs Assessment
An assessment to determine the needed space for current and near-future police needs was conducted in 2013. Moseley Architects' report was presented to  Town Council during a May 15, 2013 work session.

Executive Summary
Section 1.1: Preface/Existing Building Baseline
Section 1.2: Preface/Existing Building Baseline
Section 2: Site Design Guidelines
Section 3: Building Design Guidelines
Section 4: Space Standards
Section 5: Facility Area Spreadsheets

Project updates and milestones

July 6, 2020: Town Council Statement on Requests to Divest in the Police Department

June 15, 2020: Town Council Meeting: Council approved modifications to requirements for the police facility.

June 8, 2020: Town of Vienna Council Work Session

May 21, 2020: Board of Architectural Review


May 20, 2020: Board of Zoning Appeals


May 15, 2020: Deadline for pre-qualification submittals from contractors interested in bidding on construction contract.


May 13, 2020: 
Town of Vienna Planning Commission

April 20, 2020: 
Police Department Construction Town Council Work Session

February 5, 2020: 
Approval Process for New Police Facility

December 2, 2019: 
Vienna Voice newsletter article

October 28, 2019: 
Dewberry Update At a Council work session, Dewberry provided Town Council with an updated design for the Vienna Police Station.

May 22, 2019: 
Inside NOVA article - Vienna Police Station

May 20, 2019: Dewberry presents the 
Vienna Police Station schematic design to Town Council

January 14, 2019 - Vienna Police Station Design Concepts At the January 14 Council work session, three design concepts were shared with Councilmembers. The decision to move forward with new construction (rather than reconstruction) of the facility was made at this meeting. 

January 8, 2019: Downey & Scott hired as facility project manager

October 30, 2018: 
Dewberry hired to provide architectural and engineering services